Recommendations| Fittings| Pass Flow
>中文
Home About Us Application Download Products Technology Inquiry Contact

 
Technical Support>
Recommendations
Fittings
Pass Flow
 
 
   
  Pass Flow Introduction
 
  >Various pass flow allocations to suit different working conditions  
 
       
  1.Pipe connectors installed on the front panel (the most common allocation)   2.Water pipe connectors installed on the back panel (the most flexible allocation)   3.Two additional water pipe connectors can install temperature-controlled joints  
 
       
  4.Two refrigerant outlets can slow down the flow rate at the connections (evaporator outlet or condenser inlet)   5.Double circuit in the refrigerant side and single pass flow in the water side (evaporator or condenser)   6.Double circuit in the refrigerant side and double pass flow in the water side can achieve a relative efficient circulation.  
 
       
  7.Double circuit in the water side can be used for cooling two different water systems   8.Double circuit in the water side and double pass flow in the refrigerant side are used for various cooling media   9.Double pass flow in both sides are mainly used when the system requires very close temperature (liquid/ liquid or high pressure vapor)  
 

 

 
 
Copyright©2009 east-alliance.com All rights reserved.